Your Paint Expert Your Paint Expert
Your Paint Expert

The Framework

How to take a lead from the first call to a paid job and a Google review.

Every job goes through the same six stages. At every stage, you are doing the same three things.

ProblemFind out what they need and let them tell you.
UrgencyFind out when they need it done.
SolutionGive them the next step and book it.

The six stages

  1. 1. Initial contact.Answer fast, run the script, close over the phone or book the estimate.
  2. 2. The estimate.Build the bid before you arrive. Connect, walk the job, present at the table.
  3. 3. After the estimate.Follow up on a set date. Close it or set the next follow-up.
  4. 4. Closed job.Get the start date on the calendar. Put the client and the crew in one chat.
  5. 5. During the job.Two questions a day: is the client happy, when will we be done.
  6. 6. After the job.Collect the money. Get the Google review.

Three rules that never change

Your Paint ExpertThe Framework
Stage 1

Initial Contact

Close over the phone or book the estimate. Nothing else counts.

Tap any line to check it off.

When the phone rings

Friendly but brief. Same script every time.

  • Name, company, how can I help?
  • Problem. Stop talking. Let them explain the whole scope.
  • Urgency.
"Hey, before we get any further, when do you need us to start this project?"
  • Book it.
"We're booked out a month or two, but I'm sure I can make something happen. What's your address?"

Then give them three options for the inspection. Not "when works for you." Three options.

  • Before you hang up. Name, address, phone, notes on the project, and the appointment on the calendar. All in the CRM while they're still on the line.

When they text instead

Call them immediately. Do not text back and forth. If they don't pick up, send this and leave it:

"Hey it's [your name], call me back, I have some information for you."

Speed to lead

  • Answer every call, and answer it with the script.
  • Turn off call screening. A screened call is a lost call.
  • The first painter to talk to them is usually the one who gets the job.

Lead clean-up, every day

  • One hour, same time every day. Go through cold, warm, and hot leads.
  • Block that hour off on the calendar now. Everything else schedules around it.
  • Update the CRM while you're calling. If it's not updated, it didn't happen.
The goal of this stage: they hang up with an appointment on the calendar, and you have their name, address, phone, and project notes in the CRM.
Your Paint ExpertStage 1 · Initial Contact
Stage 2 and 3

The Estimate

Build the estimate before you get there. The visit is for connecting and closing, not measuring.

On the way

  • Text when you're an hour out.
  • Then call: "On my way, stopping for a coffee, you want one?"

At the door

"Hey, [your name] with [your company], I'm here for our estimate. Let's do a quick walk around together so you can show me the project."

The walk around

80/20. You talk 20 percent. They talk 80. No paint science. Talk about the project just enough that they feel confident in you. Ask these three:

  • "Have you gotten any other quotes?"
  • "Is your wife going to care about anything here, like colors, that I should note on the proposal?"
  • "While my guys are here, is it okay to wash brushes on site or should we do it off site?"

Break the ice: "You want the bubble gum option or the full replacement?" Then, all jokes aside, present the two options.

Step away, then sit down

"I'm going to walk around and confirm my measurements. Then if it's okay I'd like to sit down and go over the scope to make sure we're on the same page."
  • Five minutes. Take pictures.
  • Ask if shoes come off. If they offer a drink, take it. Ask where to sit.

The presentation

Have it up on your phone or iPad and scroll through it with them. You are collecting head nods. Go in this order:

  • Name
  • Address
  • Phone number
  • Email
  • Timing
  • "Let's go over the scope to make sure we're on the same page"
  • Prep. Surgical.
  • Confirm the areas of work
  • Process and paint used
  • Warranty
  • "Did I miss anything? You feel comfortable with us doing the project?" One question. Only agreements.
  • Show the pictures
  • "So your total investment on this project, labor and materials, is X."
  • Stay silent. First one to talk loses.

The three objections

You will hear the same three on almost every job. Have your answer ready before you sit down.

  • Price
  • Timing
  • Other quotes

Stage 3: after the estimate

  • Set the follow-up before you leave. A call date, and a task in the CRM.
  • On that call: "Where are we at in the decision?" Based on what they say, close it or set the next follow-up. Never leave without one or the other.
Your Paint ExpertStage 2 and 3 · The Estimate
Stage 4, 5 and 6

Production

From signed to paid. Your job is to run the job, not to be on it.

Stage 4: closed job

With the client:

"I'll keep an open line with you from now until the job starts. Any questions, text me or call me."
  • Collect the deposit if you take them.

With your crew:

  • Get the start date on the calendar.
  • Put you, the sub, and the client in one group chat. Introduce the sub as part of your team. Perception is reality.
  • The sub is responsible for the project from start to finish.

Stage 5: during the job

You are not on site. Two questions, every day:

  • "Is the client happy?"
  • "When are we going to be done?"

Stage 6: after the job

  • Collect the money.
  • Get the Google review when you get paid. It's on you to know ahead of time how the client is going to pay and how they're going to leave the review.

Finding and vetting subs

Everything above only works if you have subs you trust. The rule is leverage. You never need any one painter.

  • Never be desperate. You always know where to find more.
  • Sit down with them at a coffee shop before they ever touch a job.
  • Set expectations up front: pay structure, what they handle from start to finish, materials.
  • Collect the W9. No payment goes out until you have it.

Where to find them

  • Call your local Sherwin-Williams rep and set up three meetings with subs.
  • Post in three Facebook painter groups.

Check yourself every week

  • Walk through your last two jobs: start, in progress, finish. Where did it break?
  • Go back through each stage. What are you doing, what aren't you?
  • What's the biggest bottleneck right now, and where is it coming from?
  • Listen back to your calls. Read back your messages.
  • Pick one thing to fix this week. One.
Problem. Urgency. Solution. Every stage, every call, every job. When something isn't working, it's almost always because one of the three got skipped.
Your Paint ExpertStage 4, 5 and 6 · Production
Your checkmarks save on this device.